| 1-00484695 | 4 | AEPT | CircuitBreaker | 112_WGOR 2 P005N2 | 138 | 09/03/24 07:14:03 PM | Opportunity | IMPLEMENTED | 09/04/24 07:00:00 AM | 12/31/30 05:00:00 PM | 09/04/24 07:00:00 AM | |
| 1-00630951 | 4 | AEPT | Line | 116th Street & Peoria - Riverside Station 138 kV | 138 | 09/17/26 09:19:37 AM | Planned | COMPLETED | 10/06/26 08:00:00 AM | 10/06/26 05:00:00 PM | 10/06/26 08:55:00 AM | 10/06/26 11:26:00 AM |
| 1-00626362 | 2 | WRT | Line | 12th & Clay - 4th & Van Buren 115 kV | 115 | 09/02/26 03:40:25 PM | Planned | PREAPPROVED | 10/26/26 10:00:00 AM | 10/30/26 12:00:00 PM | | |
| 1-00626332 | 6 | WRT | Line | 12th & Clay - 4th & Van Buren 115 kV | 115 | 09/02/26 03:15:30 PM | Planned | COMPLETED | 10/12/26 07:00:00 AM | 10/16/26 12:00:00 PM | 10/12/26 08:40:00 AM | 10/13/26 01:35:00 PM |
| 1-00626362 | 2 | WRT | Line | 12th & Clay - Quinton Heights 115 kV | 115 | 09/02/26 03:40:25 PM | Planned | PREAPPROVED | 10/26/26 10:00:00 AM | 10/30/26 12:00:00 PM | | |
| 1-00626362 | 2 | WRT | Disconnect | 12th & Clay 115-739 | 0 | 09/02/26 03:40:25 PM | Planned | PREAPPROVED | 10/26/26 10:00:00 AM | 10/30/26 12:00:00 PM | | |
| 1-00626362 | 2 | WRT | Disconnect | 12th & Clay 115-743 | 0 | 09/02/26 03:40:25 PM | Planned | PREAPPROVED | 10/26/26 10:00:00 AM | 10/30/26 12:00:00 PM | | |
| 1-00626362 | 2 | WRT | Disconnect | 12th & Clay 115-744 | 0 | 09/02/26 03:40:25 PM | Planned | PREAPPROVED | 10/26/26 10:00:00 AM | 10/30/26 12:00:00 PM | | |
| 1-00626362 | 2 | WRT | Disconnect | 12th & Clay 115-749 | 0 | 09/02/26 03:40:25 PM | Planned | PREAPPROVED | 10/26/26 10:00:00 AM | 10/30/26 12:00:00 PM | | |
| 1-00609825 | 13 | AEPT | Line | 12th Street - Sugar Hill Tap 69 kV | 69 | 07/07/26 07:43:33 PM | Planned | COMPLETED | 10/20/26 09:00:00 AM | 10/22/26 01:18:00 PM | 10/20/26 07:34:00 AM | 10/22/26 01:18:00 PM |
| 1-00609825 | 13 | AEPT | CircuitBreaker | 12th Street 7910 | 69 | 07/07/26 07:43:33 PM | Planned | COMPLETED | 10/20/26 09:00:00 AM | 10/22/26 01:18:00 PM | 10/20/26 07:34:00 AM | 10/22/26 01:18:00 PM |
| 1-00602397 | 3 | MPST | Line | 13 & 40 - Odessa 69kV | 69 | 06/11/26 02:37:15 PM | Planned | PREAPPROVED | 11/02/26 08:00:00 AM | 12/22/26 04:00:00 PM | | |
| 1-00405250 | 9 | MPST | Line | 13 & 40 - Warrensburg Plant 69 kV | 69 | 03/14/23 02:38:56 PM | Planned | PREAPPROVED | 01/04/27 08:00:00 AM | 03/31/27 04:00:00 PM | | |
| 1-00622518 | 9 | MPST | Line | 13 & 40 - Warrensburg Plant 69 kV | 69 | 08/18/26 08:58:45 AM | Planned | IMPLEMENTED | 09/29/26 08:00:00 AM | 12/31/26 06:00:00 PM | 09/29/26 08:40:00 AM | |
| 1-00602397 | 3 | MPST | CircuitBreaker | 13 & 40 R5 | 69 | 06/11/26 02:37:15 PM | Planned | PREAPPROVED | 11/02/26 08:00:00 AM | 12/22/26 04:00:00 PM | | |
| 1-00405250 | 9 | MPST | CircuitBreaker | 13 & 40 R7 | 69 | 03/14/23 02:38:56 PM | Planned | PREAPPROVED | 01/04/27 08:00:00 AM | 03/31/27 04:00:00 PM | | |
| 1-00632146 | 3 | MPST | Line | 1340_JCT - PINE_STR 69 kV | 69 | 09/22/26 03:06:54 PM | Planned | IMPLEMENTED | 09/22/26 12:00:00 AM | 10/30/26 10:00:00 AM | 09/22/26 03:07:00 PM | |
| 1-00634103 | 1 | MPST | Line | 1340_JCT - PINE_STR 69 kV | 69 | 10/02/26 11:35:07 AM | Planned | SUBMITTED | 12/14/26 10:00:00 AM | 12/30/26 06:00:00 PM | | |
| 1-00642131 | 4 | MPST | Line | 1340_JCT - PINE_STR 69 kV | 69 | 10/20/26 01:03:04 PM | Urgent | PREAPPROVED | 10/27/26 08:00:00 AM | 10/27/26 06:00:00 PM | | |
| 1-00627688 | 5 | AEPT | Line | 136th Street & Yale - Kimberly Clark 138 kV | 138 | 09/08/26 09:47:12 AM | Planned | COMPLETED | 09/28/26 06:00:00 AM | 10/03/26 06:00:00 PM | 09/28/26 06:35:00 AM | 09/28/26 02:50:00 PM |
| 1-00633282 | 4 | AEPT | Line | 136th Street & Yale - Kimberly Clark 138 kV | 138 | 09/28/26 02:51:55 PM | Opportunity | COMPLETED | 09/28/26 06:00:00 AM | 10/03/26 06:00:00 PM | 09/28/26 02:54:00 PM | 09/30/26 07:06:00 PM |
| 1-00577781 | 4 | AEPT | Line | 15th & Fulton - Tulsa Southeast 138 kV | 138 | 02/24/26 07:19:47 PM | Planned | SUBMITTED | 11/23/26 08:00:00 AM | 12/04/26 04:00:00 PM | | |
| 1-00577781 | 4 | AEPT | Disconnect | 15th & Fulton 1305B | 138 | 02/24/26 07:19:47 PM | Planned | SUBMITTED | 11/23/26 08:00:00 AM | 12/04/26 04:00:00 PM | | |
| 1-00638706 | 4 | AEPT | Disconnect | 15th & Fulton 1305B | 138 | 10/13/26 02:59:36 PM | Operational | COMPLETED | 10/13/26 02:59:00 PM | 10/14/26 03:00:00 PM | 10/13/26 02:19:00 PM | 10/14/26 10:33:00 AM |
| 1-00638706 | 4 | AEPT | Disconnect | 15th & Fulton 1399C | 138 | 10/13/26 02:59:36 PM | Operational | COMPLETED | 10/13/26 02:59:00 PM | 10/14/26 03:00:00 PM | 10/13/26 02:19:00 PM | 10/14/26 10:33:00 AM |
| 1-00577781 | 4 | AEPT | Line | 15th & Fulton Tap - Yale & Archer 138 kV | 138 | 02/24/26 07:19:47 PM | Planned | SUBMITTED | 11/23/26 08:00:00 AM | 12/04/26 04:00:00 PM | | |
| 1-00577781 | 4 | AEPT | Line | 15th & Fulton Tap - Zunis 138 kV | 138 | 02/24/26 07:19:47 PM | Planned | SUBMITTED | 11/23/26 08:00:00 AM | 12/04/26 04:00:00 PM | | |
| 1-00638706 | 4 | AEPT | Line | 15th & Fulton Tap - Zunis 138 kV | 138 | 10/13/26 02:59:36 PM | Operational | COMPLETED | 10/13/26 02:59:00 PM | 10/14/26 03:00:00 PM | 10/13/26 02:19:00 PM | 10/14/26 10:33:00 AM |
| 1-00626338 | 4 | WRT | Line | 17th - Chisholm 138 kV | 138 | 09/02/26 03:19:10 PM | Planned | IMPLEMENTED | 10/19/26 04:01:00 PM | 10/30/26 08:00:00 PM | 10/19/26 10:07:00 AM | |
| 1-00632152 | 2 | WRT | Line | 17th - Mossman 69 kV | 69 | 09/22/26 03:11:22 PM | Planned | APPROVED | 10/08/26 08:00:00 AM | 12/01/26 12:00:00 AM | | |
| 1-00632155 | 3 | WRT | Line | 17TH - REDBUD4 138 kV | 138 | 09/22/26 03:14:08 PM | Planned | IMPLEMENTED | 09/22/26 12:00:00 AM | 11/13/26 10:00:00 AM | 09/22/26 03:14:00 PM | |
| 1-00638724 | 2 | WRT | CircuitBreaker | 17th & Fairlawn 115-518 | 115 | 10/13/26 04:03:30 PM | Discretionary | PREAPPROVED | 10/27/26 06:00:00 AM | 10/28/26 03:58:00 PM | | |
| 1-00622626 | 6 | WRT | CircuitBreaker | 17th & Fairlawn 115-518 | 115 | 08/18/26 01:34:28 PM | Planned | COMPLETED | 10/13/26 06:00:00 AM | 10/16/26 04:00:00 PM | 10/13/26 06:27:00 AM | 10/16/26 08:50:00 AM |
| 1-00626338 | 4 | WRT | CircuitBreaker | 17th 138-12 | 138 | 09/02/26 03:19:10 PM | Planned | IMPLEMENTED | 10/19/26 04:01:00 PM | 10/30/26 08:00:00 PM | 10/19/26 10:07:00 AM | |
| 1-00626338 | 4 | WRT | Disconnect | 17th 138-5 | 0 | 09/02/26 03:19:10 PM | Planned | IMPLEMENTED | 10/19/26 04:01:00 PM | 10/30/26 08:00:00 PM | 10/19/26 10:07:00 AM | |
| 1-00626730 | 10 | WRT | Disconnect | 18th & Plum 69-61 | 0 | 09/03/26 04:43:48 PM | Planned | COMPLETED | 10/12/26 09:00:00 AM | 10/13/26 03:00:00 PM | 10/12/26 11:02:00 AM | 10/12/26 02:58:00 PM |
| 1-00608577 | 4 | LEST | Line | 19th & Alvo - Northwest 12th & Arbor 115 kV | 115 | 07/01/26 08:49:10 AM | Planned | IMPLEMENTED | 10/12/26 08:00:00 AM | 12/11/26 04:00:00 PM | 10/12/26 11:04:00 AM | |
| 1-00608577 | 4 | LEST | CircuitBreaker | 19th & Alvo 1063L | 115 | 07/01/26 08:49:10 AM | Planned | IMPLEMENTED | 10/12/26 08:00:00 AM | 12/11/26 04:00:00 PM | 10/12/26 11:04:00 AM | |
| 1-00596564 | 4 | LEST | Line | 21st & N - 30th & A 115 kV | 115 | 05/27/26 02:09:25 PM | Planned | IMPLEMENTED | 09/14/26 08:00:00 AM | 05/28/27 04:00:00 PM | 09/14/26 01:39:00 PM | |
| 1-00596564 | 4 | LEST | Disconnect | 21st & N 1062L | 0 | 05/27/26 02:09:25 PM | Planned | IMPLEMENTED | 09/14/26 08:00:00 AM | 05/28/27 04:00:00 PM | 09/14/26 01:39:00 PM | |
| 1-00624775 | 5 | LEST | Line | 27th & Pine Lake - 40th & Rokeby 115 kV | 115 | 08/27/26 01:59:39 PM | Planned | COMPLETED | 09/28/26 08:00:00 AM | 10/01/26 04:00:00 PM | 09/28/26 08:22:00 AM | 10/01/26 08:44:00 AM |
| 1-00624775 | 5 | LEST | CircuitBreaker | 27th & Pine Lake 1001 | 115 | 08/27/26 01:59:39 PM | Planned | COMPLETED | 09/28/26 08:00:00 AM | 10/01/26 04:00:00 PM | 09/28/26 08:22:00 AM | 10/01/26 08:44:00 AM |
| 1-00624775 | 5 | LEST | Disconnect | 27th & Pine Lake 1001_D1 | 115 | 08/27/26 01:59:39 PM | Planned | COMPLETED | 09/28/26 08:00:00 AM | 10/01/26 04:00:00 PM | 09/28/26 08:22:00 AM | 10/01/26 08:44:00 AM |
| 1-00624775 | 5 | LEST | Disconnect | 27th & Pine Lake 1001_D2 | 115 | 08/27/26 01:59:39 PM | Planned | COMPLETED | 09/28/26 08:00:00 AM | 10/01/26 04:00:00 PM | 09/28/26 08:22:00 AM | 10/01/26 08:44:00 AM |
| 1-00624775 | 5 | LEST | CircuitBreaker | 27th & Pine Lake 1062-L | 115 | 08/27/26 01:59:39 PM | Planned | COMPLETED | 09/28/26 08:00:00 AM | 10/01/26 04:00:00 PM | 09/28/26 08:22:00 AM | 10/01/26 08:44:00 AM |
| 1-00624775 | 5 | LEST | CircuitBreaker | 27th & Pine Lake 2920 | 115 | 08/27/26 01:59:39 PM | Planned | COMPLETED | 09/28/26 08:00:00 AM | 10/01/26 04:00:00 PM | 09/28/26 08:22:00 AM | 10/01/26 08:44:00 AM |
| 1-00626013 | 5 | WRT | Line | 29th - Northeast WR 138 kV | 138 | 09/01/26 11:37:35 AM | Planned | COMPLETED | 10/12/26 07:00:00 AM | 10/23/26 03:00:00 PM | 10/12/26 07:32:00 AM | 10/22/26 12:41:00 PM |
| 1-00638724 | 2 | WRT | Line | 29th & Eveningside Jct - 17th & Fairlawn 115kV | 115 | 10/13/26 04:03:30 PM | Discretionary | PREAPPROVED | 10/27/26 06:00:00 AM | 10/28/26 03:58:00 PM | | |
| 1-00622626 | 6 | WRT | Line | 29th & Eveningside Jct - 17th & Fairlawn 115kV | 115 | 08/18/26 01:34:28 PM | Planned | COMPLETED | 10/13/26 06:00:00 AM | 10/16/26 04:00:00 PM | 10/13/26 06:27:00 AM | 10/16/26 08:50:00 AM |
| 1-00638724 | 2 | WRT | Line | 29th & Eveningside Jct - 29th & Gage 115kV | 115 | 10/13/26 04:03:30 PM | Discretionary | PREAPPROVED | 10/27/26 06:00:00 AM | 10/28/26 03:58:00 PM | | |
| 1-00622626 | 6 | WRT | Line | 29th & Eveningside Jct - 29th & Gage 115kV | 115 | 08/18/26 01:34:28 PM | Planned | COMPLETED | 10/13/26 06:00:00 AM | 10/16/26 04:00:00 PM | 10/13/26 06:27:00 AM | 10/16/26 08:50:00 AM |
| 1-00638724 | 2 | WRT | Disconnect | 29th & Gage 115-339 | 0 | 10/13/26 04:03:30 PM | Discretionary | PREAPPROVED | 10/27/26 06:00:00 AM | 10/28/26 03:58:00 PM | | |
| 1-00622626 | 6 | WRT | Disconnect | 29th & Gage 115-339 | 0 | 08/18/26 01:34:28 PM | Planned | COMPLETED | 10/13/26 06:00:00 AM | 10/16/26 04:00:00 PM | 10/13/26 06:27:00 AM | 10/16/26 08:50:00 AM |
| 1-00633116 | 4 | LEST | Disconnect | 29th & Leighton 4030T | 0 | 09/28/26 06:26:23 AM | Emergency | COMPLETED | 09/28/26 08:00:00 AM | 09/28/26 04:00:00 PM | 09/28/26 08:48:00 AM | 09/28/26 10:55:00 AM |
| 1-00626013 | 5 | WRT | CircuitBreaker | 29th 138-723 | 138 | 09/01/26 11:37:35 AM | Planned | COMPLETED | 10/12/26 07:00:00 AM | 10/23/26 03:00:00 PM | 10/12/26 07:32:00 AM | 10/22/26 12:41:00 PM |
| 1-00626730 | 10 | WRT | Line | 2nd & Elm - Maple Street Junction 69 kV | 69 | 09/03/26 04:43:48 PM | Planned | COMPLETED | 10/12/26 09:00:00 AM | 10/13/26 03:00:00 PM | 10/12/26 11:02:00 AM | 10/12/26 02:58:00 PM |
| 1-00596564 | 4 | LEST | Line | 30th & A - 56th & Everett 115 kV | 115 | 05/27/26 02:09:25 PM | Planned | IMPLEMENTED | 09/14/26 08:00:00 AM | 05/28/27 04:00:00 PM | 09/14/26 01:39:00 PM | |
| 1-00596564 | 4 | LEST | CircuitBreaker | 30th & A 1001 | 115 | 05/27/26 02:09:25 PM | Planned | IMPLEMENTED | 09/14/26 08:00:00 AM | 05/28/27 04:00:00 PM | 09/14/26 01:39:00 PM | |
| 1-00596564 | 4 | LEST | Disconnect | 30th & A 1001_D1 | 115 | 05/27/26 02:09:25 PM | Planned | IMPLEMENTED | 09/14/26 08:00:00 AM | 05/28/27 04:00:00 PM | 09/14/26 01:39:00 PM | |
| 1-00596564 | 4 | LEST | Disconnect | 30th & A 1001_D2 | 115 | 05/27/26 02:09:25 PM | Planned | IMPLEMENTED | 09/14/26 08:00:00 AM | 05/28/27 04:00:00 PM | 09/14/26 01:39:00 PM | |
| 1-00596564 | 4 | LEST | Disconnect | 30th & A 1061L | 115 | 05/27/26 02:09:25 PM | Planned | IMPLEMENTED | 09/14/26 08:00:00 AM | 05/28/27 04:00:00 PM | 09/14/26 01:39:00 PM | |
| 1-00596564 | 4 | LEST | Disconnect | 30th & A 1062L | 0 | 05/27/26 02:09:25 PM | Planned | IMPLEMENTED | 09/14/26 08:00:00 AM | 05/28/27 04:00:00 PM | 09/14/26 01:39:00 PM | |
| 1-00596564 | 4 | LEST | CircuitBreaker | 30th & A 5210 | 115 | 05/27/26 02:09:25 PM | Planned | IMPLEMENTED | 09/14/26 08:00:00 AM | 05/28/27 04:00:00 PM | 09/14/26 01:39:00 PM | |
| 1-00596564 | 4 | LEST | CircuitBreaker | 30th & A 5220 | 115 | 05/27/26 02:09:25 PM | Planned | IMPLEMENTED | 09/14/26 08:00:00 AM | 05/28/27 04:00:00 PM | 09/14/26 01:39:00 PM | |
| 1-00612178 | 7 | LEST | Line | 33rd & Superior - 59th & Cornhusker 115 kV | 115 | 07/20/26 02:31:18 PM | Planned | IMPLEMENTED | 10/19/26 08:00:00 AM | 12/31/26 04:00:00 PM | 10/19/26 08:12:00 AM | |
| 1-00612178 | 7 | LEST | CircuitBreaker | 33rd & Superior 3359_L | 115 | 07/20/26 02:31:18 PM | Planned | IMPLEMENTED | 10/19/26 08:00:00 AM | 12/31/26 04:00:00 PM | 10/19/26 08:12:00 AM | |
| 1-00636431 | 2 | OKGET | Line | 36 & Meridian - SW 5th 138 kV | 138 | 10/08/26 07:34:24 AM | Planned | PREAPPROVED | 10/26/26 11:30:00 AM | 10/29/26 09:00:00 AM | | |
| 1-00634138 | 1 | MPST | Line | 3M - Metz 69 kV | 69 | 10/02/26 01:34:41 PM | Planned | SUBMITTED | 01/25/27 08:00:00 AM | 03/05/27 09:00:00 AM | | |
| 1-00634138 | 1 | MPST | Line | 3M - Nevada Junction 69 kV | 69 | 10/02/26 01:34:41 PM | Planned | SUBMITTED | 01/25/27 08:00:00 AM | 03/05/27 09:00:00 AM | | |
| 1-00635322 | 1 | WRT | Transformer | 3rd & Van Buren 115/69 kV XFMR | 69 | 10/07/26 03:43:08 PM | Planned | SUBMITTED | 01/18/27 06:00:00 AM | 01/29/27 03:00:00 PM | | |
| 1-00635322 | 1 | WRT | CircuitBreaker | 3rd & Van Buren 115-660 | 115 | 10/07/26 03:43:08 PM | Planned | SUBMITTED | 01/18/27 06:00:00 AM | 01/29/27 03:00:00 PM | | |
| 1-00635322 | 1 | WRT | CircuitBreaker | 3rd & Van Buren 69-66 | 69 | 10/07/26 03:43:08 PM | Planned | SUBMITTED | 01/18/27 06:00:00 AM | 01/29/27 03:00:00 PM | | |
| 1-00617987 | 5 | OKGET | Line | 3rd Street - Arkoma 161 kV | 161 | 08/12/26 02:11:02 PM | Planned | PREAPPROVED | 11/12/26 08:00:00 AM | 11/12/26 03:00:00 PM | | |
| 1-00596480 | 14 | OKGET | Line | 3rd Street - J Street 161 kV | 161 | 05/27/26 08:57:15 AM | Planned | SUBMITTED | 11/09/26 08:00:00 AM | 11/11/26 03:00:00 PM | | |
| 1-00642144 | 1 | OKGET | Line | 3rd Street - Muldrow Tap 69 kV | 69 | 10/20/26 01:46:12 PM | Planned | SUBMITTED | 11/04/26 09:00:00 AM | 11/04/26 05:00:00 PM | | |
| 1-00617987 | 5 | OKGET | Disconnect | 3rd Street 124 | 0 | 08/12/26 02:11:02 PM | Planned | PREAPPROVED | 11/12/26 08:00:00 AM | 11/12/26 03:00:00 PM | | |
| 1-00596480 | 14 | OKGET | Disconnect | 3rd Street 131 | 161 | 05/27/26 08:57:15 AM | Planned | SUBMITTED | 11/09/26 08:00:00 AM | 11/11/26 03:00:00 PM | | |
| 1-00617987 | 5 | OKGET | Disconnect | 3rd Street 132 | 161 | 08/12/26 02:11:02 PM | Planned | PREAPPROVED | 11/12/26 08:00:00 AM | 11/12/26 03:00:00 PM | | |
| 1-00617987 | 5 | OKGET | Transformer | 3rd Street 161/69 kV XFMR #4 | 69 | 08/12/26 02:11:02 PM | Planned | PREAPPROVED | 11/12/26 08:00:00 AM | 11/12/26 03:00:00 PM | | |
| 1-00596480 | 14 | OKGET | Transformer | 3rd Street 161/69 kV XFMR #5 | 69 | 05/27/26 08:57:15 AM | Planned | SUBMITTED | 11/09/26 08:00:00 AM | 11/11/26 03:00:00 PM | | |
| 1-00642144 | 1 | OKGET | CircuitBreaker | 3rd Street 32 | 69 | 10/20/26 01:46:12 PM | Planned | SUBMITTED | 11/04/26 09:00:00 AM | 11/04/26 05:00:00 PM | | |
| 1-00596480 | 14 | OKGET | CircuitBreaker | 3rd Street Circuit Breaker T115 | 161 | 05/27/26 08:57:15 AM | Planned | SUBMITTED | 11/09/26 08:00:00 AM | 11/11/26 03:00:00 PM | | |
| 1-00617987 | 5 | OKGET | CircuitBreaker | 3rd Street Circuit Breaker T115 | 161 | 08/12/26 02:11:02 PM | Planned | PREAPPROVED | 11/12/26 08:00:00 AM | 11/12/26 03:00:00 PM | | |
| 1-00617987 | 5 | OKGET | Disconnect | 3rd Street Disconnect 44 | 69 | 08/12/26 02:11:02 PM | Planned | PREAPPROVED | 11/12/26 08:00:00 AM | 11/12/26 03:00:00 PM | | |
| 1-00596480 | 14 | OKGET | Disconnect | 3rd Street Disconnect 45 | 69 | 05/27/26 08:57:15 AM | Planned | SUBMITTED | 11/09/26 08:00:00 AM | 11/11/26 03:00:00 PM | | |
| 1-00608345 | 8 | WRT | Line | 3VAN - MDOW 115 kV | 115 | 06/30/26 10:32:49 AM | Planned | COMPLETED | 10/09/26 12:00:00 PM | 10/09/26 05:00:00 PM | 10/09/26 09:02:00 AM | 10/09/26 11:24:00 AM |
| 1-00635322 | 1 | WRT | Disconnect | 3VAN DS 115-662 | 115 | 10/07/26 03:43:08 PM | Planned | SUBMITTED | 01/18/27 06:00:00 AM | 01/29/27 03:00:00 PM | | |
| 1-00639004 | 2 | LEST | Line | 40th & Bennet - SW Bennet 115 kV | 115 | 10/14/26 01:47:57 PM | Planned | PREAPPROVED | 11/30/26 08:00:00 AM | 12/04/26 04:00:00 PM | | |
| 1-00639004 | 2 | LEST | Disconnect | 40th & Bennet 1063L | 115 | 10/14/26 01:47:57 PM | Planned | PREAPPROVED | 11/30/26 08:00:00 AM | 12/04/26 04:00:00 PM | | |
| 1-00624776 | 6 | LEST | Line | 40th & Rokeby - 56th & Pine Lake 115 kV | 115 | 08/27/26 02:02:14 PM | Planned | COMPLETED | 10/05/26 08:00:00 AM | 10/08/26 04:00:00 PM | 10/05/26 09:33:00 AM | 10/07/26 02:35:00 PM |
| 1-00608345 | 8 | WRT | Disconnect | 43rd & Lorraine 115-1244 | 0 | 06/30/26 10:32:49 AM | Planned | COMPLETED | 10/09/26 12:00:00 PM | 10/09/26 05:00:00 PM | 10/09/26 09:02:00 AM | 10/09/26 11:24:00 AM |
| 1-00608345 | 8 | WRT | Line | 43rd Lorraine - Tower 33 115kV | 115 | 06/30/26 10:32:49 AM | Planned | COMPLETED | 10/09/26 12:00:00 PM | 10/09/26 05:00:00 PM | 10/09/26 09:02:00 AM | 10/09/26 11:24:00 AM |
| 1-00642444 | 1 | WRT | Line | 45th St. - Gordan Evans 138kV | 138 | 10/21/26 04:33:40 PM | Planned | SUBMITTED | 11/09/26 08:00:00 AM | 11/10/26 04:00:00 PM | | |
| 1-00642444 | 1 | WRT | Disconnect | 45th Street 715 | 0 | 10/21/26 04:33:40 PM | Planned | SUBMITTED | 11/09/26 08:00:00 AM | 11/10/26 04:00:00 PM | | |
| 1-00577441 | 4 | AEPT | Line | 46th Street Tap - Pine Tap 138 kV | 138 | 02/22/26 07:14:49 PM | Planned | SUBMITTED | 01/11/27 08:00:00 AM | 05/27/27 05:00:00 PM | | |
| 1-00577441 | 4 | AEPT | Line | 46th Street Tap - Tulsa North 138 kV | 138 | 02/22/26 07:14:49 PM | Planned | SUBMITTED | 01/11/27 08:00:00 AM | 05/27/27 05:00:00 PM | | |
| 1-00633183 | 5 | AEPT | Line | 46th Street Tap - Tulsa North 138 kV | 138 | 09/28/26 09:40:57 AM | Planned | COMPLETED | 10/19/26 07:00:00 AM | 10/19/26 11:00:00 AM | 10/19/26 09:39:00 AM | 10/19/26 02:42:00 PM |
| 1-00626022 | 6 | WRT | Line | 4th & Van Buren - North Tyler 115 kV | 115 | 09/01/26 11:40:24 AM | Planned | COMPLETED | 10/19/26 07:00:00 AM | 10/23/26 12:00:00 PM | 10/19/26 09:17:00 AM | 10/22/26 09:45:00 AM |
| 1-00626332 | 6 | WRT | Disconnect | 4th & Van Buren 115-684 | 0 | 09/02/26 03:15:30 PM | Planned | COMPLETED | 10/12/26 07:00:00 AM | 10/16/26 12:00:00 PM | 10/12/26 08:40:00 AM | 10/13/26 01:35:00 PM |
| 1-00626332 | 6 | WRT | Disconnect | 4th & Van Buren 115-687 | 0 | 09/02/26 03:15:30 PM | Planned | COMPLETED | 10/12/26 07:00:00 AM | 10/16/26 12:00:00 PM | 10/12/26 08:40:00 AM | 10/13/26 01:35:00 PM |