| 1-00562944 | 2 | LEST | Line | 103rd & Rokeby - Wagener LES 345 kV | 345 | 12/10/25 09:11:42 AM | Planned | PREAPPROVED | 03/02/26 08:00:00 AM | 03/31/26 04:00:00 PM | | |
| 1-00556782 | 7 | LEST | Line | 103rd & Rokeby - Wagener LES 345 kV | 345 | 11/06/25 03:31:40 PM | Planned | COMPLETED | 12/16/25 08:00:00 AM | 12/18/25 04:00:00 PM | 12/16/25 08:46:00 AM | 12/17/25 10:52:00 AM |
| 1-00556782 | 7 | LEST | Disconnect | 103rd & Rokeby 3001_D1 | 345 | 11/06/25 03:31:40 PM | Planned | COMPLETED | 12/16/25 08:00:00 AM | 12/18/25 04:00:00 PM | 12/16/25 08:46:00 AM | 12/17/25 10:52:00 AM |
| 1-00556782 | 7 | LEST | Disconnect | 103rd & Rokeby 3001_D2 | 345 | 11/06/25 03:31:40 PM | Planned | COMPLETED | 12/16/25 08:00:00 AM | 12/18/25 04:00:00 PM | 12/16/25 08:46:00 AM | 12/17/25 10:52:00 AM |
| 1-00556782 | 7 | LEST | Disconnect | 103rd & Rokeby 3002_D1 | 345 | 11/06/25 03:31:40 PM | Planned | COMPLETED | 12/16/25 08:00:00 AM | 12/18/25 04:00:00 PM | 12/16/25 08:46:00 AM | 12/17/25 10:52:00 AM |
| 1-00556782 | 7 | LEST | Disconnect | 103rd & Rokeby 3002_D2 | 345 | 11/06/25 03:31:40 PM | Planned | COMPLETED | 12/16/25 08:00:00 AM | 12/18/25 04:00:00 PM | 12/16/25 08:46:00 AM | 12/17/25 10:52:00 AM |
| 1-00562944 | 2 | LEST | Disconnect | 103rd & Rokeby 3064L | 345 | 12/10/25 09:11:42 AM | Planned | PREAPPROVED | 03/02/26 08:00:00 AM | 03/31/26 04:00:00 PM | | |
| 1-00556782 | 7 | LEST | Disconnect | 103rd & Rokeby 3064L | 345 | 11/06/25 03:31:40 PM | Planned | COMPLETED | 12/16/25 08:00:00 AM | 12/18/25 04:00:00 PM | 12/16/25 08:46:00 AM | 12/17/25 10:52:00 AM |
| 1-00556782 | 7 | LEST | CircuitBreaker | 103rd & Rokeby 345kV CB 3001 | 345 | 11/06/25 03:31:40 PM | Planned | COMPLETED | 12/16/25 08:00:00 AM | 12/18/25 04:00:00 PM | 12/16/25 08:46:00 AM | 12/17/25 10:52:00 AM |
| 1-00556782 | 7 | LEST | CircuitBreaker | 103rd & Rokeby 345kV CB 3002 | 345 | 11/06/25 03:31:40 PM | Planned | COMPLETED | 12/16/25 08:00:00 AM | 12/18/25 04:00:00 PM | 12/16/25 08:46:00 AM | 12/17/25 10:52:00 AM |
| 1-00555934 | 6 | AEPT | Line | 112_WGOR - AIRGSTMP 138 kV | 138 | 10/31/25 02:30:01 PM | Planned | APPROVED | 12/26/25 06:00:00 AM | 12/26/25 10:00:00 AM | | |
| 1-00484695 | 4 | AEPT | CircuitBreaker | 112_WGOR 2 P005N2 | 138 | 09/03/24 07:14:03 PM | Opportunity | IMPLEMENTED | 09/04/24 07:00:00 AM | 12/31/30 05:00:00 PM | 09/04/24 07:00:00 AM | |
| 1-00536568 | 17 | AEPT | Disconnect | 116PEORI 4 P00268 | 138 | 06/25/25 01:53:10 PM | Planned | COMPLETED | 12/15/25 08:00:00 AM | 12/18/25 04:00:00 PM | 12/15/25 06:20:00 AM | 12/16/25 01:45:00 PM |
| 1-00554060 | 6 | AEPT | Disconnect | 116PEORI 4 P00277 | 138 | 10/24/25 12:38:59 PM | Planned | PREAPPROVED | 01/19/26 08:00:00 AM | 01/19/26 05:00:00 PM | | |
| 1-00535720 | 11 | AEPT | Disconnect | 116PEORI 4 P00277 | 138 | 06/19/25 10:14:04 AM | Planned | COMPLETED | 12/01/25 08:00:00 AM | 12/01/25 05:00:00 PM | 12/01/25 08:20:00 AM | 12/02/25 10:41:00 AM |
| 1-00554060 | 6 | AEPT | Line | 116th Street & Peoria - Jenks 138 kV | 138 | 10/24/25 12:38:59 PM | Planned | PREAPPROVED | 01/19/26 08:00:00 AM | 01/19/26 05:00:00 PM | | |
| 1-00535720 | 11 | AEPT | Line | 116th Street & Peoria - Jenks 138 kV | 138 | 06/19/25 10:14:04 AM | Planned | COMPLETED | 12/01/25 08:00:00 AM | 12/01/25 05:00:00 PM | 12/01/25 08:20:00 AM | 12/02/25 10:41:00 AM |
| 1-00536568 | 17 | AEPT | Line | 116th Street & Peoria - Riverside Station 138 kV | 138 | 06/25/25 01:53:10 PM | Planned | COMPLETED | 12/15/25 08:00:00 AM | 12/18/25 04:00:00 PM | 12/15/25 06:20:00 AM | 12/16/25 01:45:00 PM |
| 1-00405250 | 7 | MPST | Line | 13 & 40 - Warrensburg Plant 69 kV | 69 | 03/14/23 02:38:56 PM | Planned | PREAPPROVED | 09/15/26 08:00:00 AM | 12/31/26 04:00:00 PM | | |
| 1-00405250 | 7 | MPST | CircuitBreaker | 13 & 40 R7 | 69 | 03/14/23 02:38:56 PM | Planned | PREAPPROVED | 09/15/26 08:00:00 AM | 12/31/26 04:00:00 PM | | |
| 1-00551761 | 5 | AEPT | Line | 136th Street & Yale - Kimberly Clark 138 kV | 138 | 10/06/25 10:48:24 AM | Planned | IMPLEMENTED | 12/03/25 08:00:00 AM | 01/17/26 04:00:00 PM | 12/04/25 07:54:29 AM | |
| 1-00563834 | 1 | AEPT | Line | 136th Street & Yale - Kimberly Clark 138 kV | 138 | 12/15/25 02:18:02 PM | Planned | SUBMITTED | 02/23/26 07:00:00 AM | 02/26/26 05:00:00 PM | | |
| 1-00551761 | 5 | AEPT | Line | 136th Street & Yale - Riverside Station 138 kV | 138 | 10/06/25 10:48:24 AM | Planned | IMPLEMENTED | 12/03/25 08:00:00 AM | 01/17/26 04:00:00 PM | 12/04/25 07:54:29 AM | |
| 1-00563834 | 1 | AEPT | Line | 136th Street & Yale - Riverside Station 138 kV | 138 | 12/15/25 02:18:02 PM | Planned | SUBMITTED | 02/23/26 07:00:00 AM | 02/26/26 05:00:00 PM | | |
| 1-00558674 | 5 | AEPT | Line | 15th & Fulton - 21st Street and 89th East Avenue 138 kV | 138 | 11/14/25 02:48:33 PM | Planned | PREAPPROVED | 01/05/26 06:00:00 AM | 01/09/26 06:00:00 PM | | |
| 1-00555944 | 3 | AEPT | Line | 15th & Fulton - Tulsa Southeast 138 kV | 138 | 10/31/25 02:52:55 PM | Planned | PREAPPROVED | 03/02/26 08:00:00 AM | 03/12/26 04:00:00 PM | | |
| 1-00558674 | 5 | AEPT | Disconnect | 15th & Fulton 1301B | 138 | 11/14/25 02:48:33 PM | Planned | PREAPPROVED | 01/05/26 06:00:00 AM | 01/09/26 06:00:00 PM | | |
| 1-00555944 | 3 | AEPT | Disconnect | 15th & Fulton 1305B | 138 | 10/31/25 02:52:55 PM | Planned | PREAPPROVED | 03/02/26 08:00:00 AM | 03/12/26 04:00:00 PM | | |
| 1-00555944 | 3 | AEPT | Line | 15th & Fulton Tap - Yale & Archer 138 kV | 138 | 10/31/25 02:52:55 PM | Planned | PREAPPROVED | 03/02/26 08:00:00 AM | 03/12/26 04:00:00 PM | | |
| 1-00555944 | 3 | AEPT | Line | 15th & Fulton Tap - Zunis 138 kV | 138 | 10/31/25 02:52:55 PM | Planned | PREAPPROVED | 03/02/26 08:00:00 AM | 03/12/26 04:00:00 PM | | |
| 1-00551807 | 7 | LEST | Line | 17th & Holdrege - 29th & Leighton 115 kV | 115 | 10/06/25 01:48:59 PM | Planned | COMPLETED | 12/08/25 08:00:00 AM | 12/08/25 04:00:00 PM | 12/08/25 08:51:00 AM | 12/08/25 10:48:00 AM |
| 1-00551919 | 3 | LEST | Line | 17th & Holdrege - 8th & N 115 kV | 115 | 10/07/25 10:56:07 AM | Planned | PREAPPROVED | 01/19/26 08:00:00 AM | 02/06/26 04:00:00 PM | | |
| 1-00551919 | 3 | LEST | CircuitBreaker | 17th & Holdrege 1001 | 115 | 10/07/25 10:56:07 AM | Planned | PREAPPROVED | 01/19/26 08:00:00 AM | 02/06/26 04:00:00 PM | | |
| 1-00551919 | 3 | LEST | CircuitBreaker | 17th & Holdrege 1003 | 115 | 10/07/25 10:56:07 AM | Planned | PREAPPROVED | 01/19/26 08:00:00 AM | 02/06/26 04:00:00 PM | | |
| 1-00551807 | 7 | LEST | Disconnect | 17th & Holdrege 1061 | 115 | 10/06/25 01:48:59 PM | Planned | COMPLETED | 12/08/25 08:00:00 AM | 12/08/25 04:00:00 PM | 12/08/25 08:51:00 AM | 12/08/25 10:48:00 AM |
| 1-00551919 | 3 | LEST | Disconnect | 17th & Holdrege 1063 | 115 | 10/07/25 10:56:07 AM | Planned | PREAPPROVED | 01/19/26 08:00:00 AM | 02/06/26 04:00:00 PM | | |
| 1-00551919 | 3 | LEST | CircuitBreaker | 17th & Holdrege 1910 | 115 | 10/07/25 10:56:07 AM | Planned | PREAPPROVED | 01/19/26 08:00:00 AM | 02/06/26 04:00:00 PM | | |
| 1-00551819 | 4 | LEST | Line | 20th & Pioneer - 40th & Gertie 115 kV | 115 | 10/06/25 02:42:08 PM | Planned | PREAPPROVED | 01/12/26 09:00:00 AM | 05/29/26 04:00:00 PM | | |
| 1-00562934 | 2 | LEST | CircuitBreaker | 20th & Pioneer 1001 | 115 | 12/10/25 08:45:27 AM | Planned | PREAPPROVED | 01/12/26 08:00:00 AM | 01/16/26 04:00:00 PM | | |
| 1-00562934 | 2 | LEST | Disconnect | 20th & Pioneer 1001_D1 | 115 | 12/10/25 08:45:27 AM | Planned | PREAPPROVED | 01/12/26 08:00:00 AM | 01/16/26 04:00:00 PM | | |
| 1-00562934 | 2 | LEST | Disconnect | 20th & Pioneer 1001_D2 | 115 | 12/10/25 08:45:27 AM | Planned | PREAPPROVED | 01/12/26 08:00:00 AM | 01/16/26 04:00:00 PM | | |
| 1-00562934 | 2 | LEST | CircuitBreaker | 20th & Pioneer 1002 | 115 | 12/10/25 08:45:27 AM | Planned | PREAPPROVED | 01/12/26 08:00:00 AM | 01/16/26 04:00:00 PM | | |
| 1-00562934 | 2 | LEST | Disconnect | 20th & Pioneer 1002_D1 | 115 | 12/10/25 08:45:27 AM | Planned | PREAPPROVED | 01/12/26 08:00:00 AM | 01/16/26 04:00:00 PM | | |
| 1-00562934 | 2 | LEST | Disconnect | 20th & Pioneer 1002_D2 | 115 | 12/10/25 08:45:27 AM | Planned | PREAPPROVED | 01/12/26 08:00:00 AM | 01/16/26 04:00:00 PM | | |
| 1-00551819 | 4 | LEST | CircuitBreaker | 20th & Pioneer 1061_L | 115 | 10/06/25 02:42:08 PM | Planned | PREAPPROVED | 01/12/26 09:00:00 AM | 05/29/26 04:00:00 PM | | |
| 1-00562934 | 2 | LEST | CircuitBreaker | 20th & Pioneer 3820 | 115 | 12/10/25 08:45:27 AM | Planned | PREAPPROVED | 01/12/26 08:00:00 AM | 01/16/26 04:00:00 PM | | |
| 1-00565418 | 1 | WRT | Line | 21st - Vista Park 69 kV | 69 | 12/18/25 12:39:51 PM | Planned | SUBMITTED | 02/16/26 06:00:00 AM | 04/03/26 03:00:00 PM | | |
| 1-00558674 | 5 | AEPT | Line | 21st Street Tap - 21st Street and 89th East Avenue 138 kV | 138 | 11/14/25 02:48:33 PM | Planned | PREAPPROVED | 01/05/26 06:00:00 AM | 01/09/26 06:00:00 PM | | |
| 1-00558674 | 5 | AEPT | Line | 21st Street Tap - Mingo 138 kV | 138 | 11/14/25 02:48:33 PM | Planned | PREAPPROVED | 01/05/26 06:00:00 AM | 01/09/26 06:00:00 PM | | |
| 1-00558674 | 5 | AEPT | Line | 21st Street Tap - Tulsa Southeast 138 kV | 138 | 11/14/25 02:48:33 PM | Planned | PREAPPROVED | 01/05/26 06:00:00 AM | 01/09/26 06:00:00 PM | | |
| 1-00565418 | 1 | WRT | Disconnect | 21st W69-105 | 0 | 12/18/25 12:39:51 PM | Planned | SUBMITTED | 02/16/26 06:00:00 AM | 04/03/26 03:00:00 PM | | |
| 1-00551806 | 6 | LEST | Line | 29th & Leighton - 33rd & Superior 115 kV | 115 | 10/06/25 01:42:00 PM | Planned | COMPLETED | 12/03/25 08:00:00 AM | 12/04/25 04:00:00 PM | 12/03/25 09:28:00 AM | 12/04/25 01:22:00 PM |
| 1-00551806 | 6 | LEST | CircuitBreaker | 29th & Leighton 1001 | 115 | 10/06/25 01:42:00 PM | Planned | COMPLETED | 12/03/25 08:00:00 AM | 12/04/25 04:00:00 PM | 12/03/25 09:28:00 AM | 12/04/25 01:22:00 PM |
| 1-00551807 | 7 | LEST | CircuitBreaker | 29th & Leighton 1001 | 115 | 10/06/25 01:48:59 PM | Planned | COMPLETED | 12/08/25 08:00:00 AM | 12/08/25 04:00:00 PM | 12/08/25 08:51:00 AM | 12/08/25 10:48:00 AM |
| 1-00551806 | 6 | LEST | Disconnect | 29th & Leighton 1001-D1 | 0 | 10/06/25 01:42:00 PM | Planned | COMPLETED | 12/03/25 08:00:00 AM | 12/04/25 04:00:00 PM | 12/03/25 09:28:00 AM | 12/04/25 01:22:00 PM |
| 1-00551807 | 7 | LEST | Disconnect | 29th & Leighton 1001-D1 | 0 | 10/06/25 01:48:59 PM | Planned | COMPLETED | 12/08/25 08:00:00 AM | 12/08/25 04:00:00 PM | 12/08/25 08:51:00 AM | 12/08/25 10:48:00 AM |
| 1-00551806 | 6 | LEST | Disconnect | 29th & Leighton 1001-D2 | 0 | 10/06/25 01:42:00 PM | Planned | COMPLETED | 12/03/25 08:00:00 AM | 12/04/25 04:00:00 PM | 12/03/25 09:28:00 AM | 12/04/25 01:22:00 PM |
| 1-00551807 | 7 | LEST | Disconnect | 29th & Leighton 1001-D2 | 0 | 10/06/25 01:48:59 PM | Planned | COMPLETED | 12/08/25 08:00:00 AM | 12/08/25 04:00:00 PM | 12/08/25 08:51:00 AM | 12/08/25 10:48:00 AM |
| 1-00551815 | 5 | LEST | CircuitBreaker | 29th & Leighton 1002 | 115 | 10/06/25 02:19:06 PM | Planned | COMPLETED | 12/05/25 08:00:00 AM | 12/05/25 04:00:00 PM | 12/05/25 09:28:00 AM | 12/05/25 11:27:00 AM |
| 1-00551807 | 7 | LEST | CircuitBreaker | 29th & Leighton 1002 | 115 | 10/06/25 01:48:59 PM | Planned | COMPLETED | 12/08/25 08:00:00 AM | 12/08/25 04:00:00 PM | 12/08/25 08:51:00 AM | 12/08/25 10:48:00 AM |
| 1-00551815 | 5 | LEST | Disconnect | 29th & Leighton 1002-D1 | 0 | 10/06/25 02:19:06 PM | Planned | COMPLETED | 12/05/25 08:00:00 AM | 12/05/25 04:00:00 PM | 12/05/25 09:28:00 AM | 12/05/25 11:27:00 AM |
| 1-00551807 | 7 | LEST | Disconnect | 29th & Leighton 1002-D1 | 0 | 10/06/25 01:48:59 PM | Planned | COMPLETED | 12/08/25 08:00:00 AM | 12/08/25 04:00:00 PM | 12/08/25 08:51:00 AM | 12/08/25 10:48:00 AM |
| 1-00551815 | 5 | LEST | Disconnect | 29th & Leighton 1002-D2 | 0 | 10/06/25 02:19:06 PM | Planned | COMPLETED | 12/05/25 08:00:00 AM | 12/05/25 04:00:00 PM | 12/05/25 09:28:00 AM | 12/05/25 11:27:00 AM |
| 1-00551807 | 7 | LEST | Disconnect | 29th & Leighton 1002-D2 | 0 | 10/06/25 01:48:59 PM | Planned | COMPLETED | 12/08/25 08:00:00 AM | 12/08/25 04:00:00 PM | 12/08/25 08:51:00 AM | 12/08/25 10:48:00 AM |
| 1-00551806 | 6 | LEST | CircuitBreaker | 29th & Leighton 1003 | 115 | 10/06/25 01:42:00 PM | Planned | COMPLETED | 12/03/25 08:00:00 AM | 12/04/25 04:00:00 PM | 12/03/25 09:28:00 AM | 12/04/25 01:22:00 PM |
| 1-00551815 | 5 | LEST | CircuitBreaker | 29th & Leighton 1003 | 115 | 10/06/25 02:19:06 PM | Planned | COMPLETED | 12/05/25 08:00:00 AM | 12/05/25 04:00:00 PM | 12/05/25 09:28:00 AM | 12/05/25 11:27:00 AM |
| 1-00551806 | 6 | LEST | Disconnect | 29th & Leighton 1003-D1 | 0 | 10/06/25 01:42:00 PM | Planned | COMPLETED | 12/03/25 08:00:00 AM | 12/04/25 04:00:00 PM | 12/03/25 09:28:00 AM | 12/04/25 01:22:00 PM |
| 1-00551815 | 5 | LEST | Disconnect | 29th & Leighton 1003-D1 | 0 | 10/06/25 02:19:06 PM | Planned | COMPLETED | 12/05/25 08:00:00 AM | 12/05/25 04:00:00 PM | 12/05/25 09:28:00 AM | 12/05/25 11:27:00 AM |
| 1-00551806 | 6 | LEST | Disconnect | 29th & Leighton 1003-D2 | 0 | 10/06/25 01:42:00 PM | Planned | COMPLETED | 12/03/25 08:00:00 AM | 12/04/25 04:00:00 PM | 12/03/25 09:28:00 AM | 12/04/25 01:22:00 PM |
| 1-00551815 | 5 | LEST | Disconnect | 29th & Leighton 1003-D2 | 0 | 10/06/25 02:19:06 PM | Planned | COMPLETED | 12/05/25 08:00:00 AM | 12/05/25 04:00:00 PM | 12/05/25 09:28:00 AM | 12/05/25 11:27:00 AM |
| 1-00551806 | 6 | LEST | Disconnect | 29th & Leighton 1061L | 0 | 10/06/25 01:42:00 PM | Planned | COMPLETED | 12/03/25 08:00:00 AM | 12/04/25 04:00:00 PM | 12/03/25 09:28:00 AM | 12/04/25 01:22:00 PM |
| 1-00551807 | 7 | LEST | Disconnect | 29th & Leighton 1062L | 0 | 10/06/25 01:48:59 PM | Planned | COMPLETED | 12/08/25 08:00:00 AM | 12/08/25 04:00:00 PM | 12/08/25 08:51:00 AM | 12/08/25 10:48:00 AM |
| 1-00551815 | 5 | LEST | Disconnect | 29th & Leighton 4030T | 0 | 10/06/25 02:19:06 PM | Planned | COMPLETED | 12/05/25 08:00:00 AM | 12/05/25 04:00:00 PM | 12/05/25 09:28:00 AM | 12/05/25 11:27:00 AM |
| 1-00551806 | 6 | LEST | CircuitBreaker | 29th & Leighton CS4010 | 115 | 10/06/25 01:42:00 PM | Planned | COMPLETED | 12/03/25 08:00:00 AM | 12/04/25 04:00:00 PM | 12/03/25 09:28:00 AM | 12/04/25 01:22:00 PM |
| 1-00551807 | 7 | LEST | CircuitBreaker | 29th & Leighton CS4020 | 115 | 10/06/25 01:48:59 PM | Planned | COMPLETED | 12/08/25 08:00:00 AM | 12/08/25 04:00:00 PM | 12/08/25 08:51:00 AM | 12/08/25 10:48:00 AM |
| 1-00536495 | 9 | WRT | Disconnect | 2MAD 4 2514 | 115 | 06/25/25 08:46:37 AM | Planned | PREAPPROVED | 01/12/26 09:00:00 AM | 01/30/26 10:00:00 PM | | |
| 1-00536495 | 9 | WRT | Line | 2nd & Madison - 4th & Van Buren 115 kV | 115 | 06/25/25 08:46:37 AM | Planned | PREAPPROVED | 01/12/26 09:00:00 AM | 01/30/26 10:00:00 PM | | |
| 1-00551917 | 4 | LEST | Line | 2nd & N - 8th & N 115 kV | 115 | 10/07/25 10:52:21 AM | Planned | PREAPPROVED | 01/05/26 08:00:00 AM | 01/16/26 04:00:00 PM | | |
| 1-00551917 | 4 | LEST | CircuitBreaker | 2nd & N 1001 | 115 | 10/07/25 10:52:21 AM | Planned | PREAPPROVED | 01/05/26 08:00:00 AM | 01/16/26 04:00:00 PM | | |
| 1-00551917 | 4 | LEST | Disconnect | 2nd & N 1001_D1 | 115 | 10/07/25 10:52:21 AM | Planned | PREAPPROVED | 01/05/26 08:00:00 AM | 01/16/26 04:00:00 PM | | |
| 1-00551917 | 4 | LEST | Disconnect | 2nd & N 1001_D2 | 115 | 10/07/25 10:52:21 AM | Planned | PREAPPROVED | 01/05/26 08:00:00 AM | 01/16/26 04:00:00 PM | | |
| 1-00551917 | 4 | LEST | CircuitBreaker | 2nd & N 1002 | 115 | 10/07/25 10:52:21 AM | Planned | PREAPPROVED | 01/05/26 08:00:00 AM | 01/16/26 04:00:00 PM | | |
| 1-00561389 | 2 | LEST | CircuitBreaker | 2nd & N 1002 | 115 | 12/07/25 04:00:07 AM | Opportunity | CANCELLED | 12/07/25 04:00:00 AM | 12/08/25 04:00:00 PM | | |
| 1-00561390 | 2 | LEST | CircuitBreaker | 2nd & N 1002 | 115 | 12/07/25 04:02:50 AM | Forced | COMPLETED | 12/07/25 04:02:00 AM | 12/08/25 04:00:00 PM | 12/07/25 04:02:00 AM | 12/08/25 03:57:00 PM |
| 1-00551917 | 4 | LEST | Disconnect | 2nd & N 1002_D1 | 115 | 10/07/25 10:52:21 AM | Planned | PREAPPROVED | 01/05/26 08:00:00 AM | 01/16/26 04:00:00 PM | | |
| 1-00561389 | 2 | LEST | Disconnect | 2nd & N 1002_D1 | 115 | 12/07/25 04:00:07 AM | Opportunity | CANCELLED | 12/07/25 04:00:00 AM | 12/08/25 04:00:00 PM | | |
| 1-00561390 | 2 | LEST | Disconnect | 2nd & N 1002_D1 | 115 | 12/07/25 04:02:50 AM | Forced | COMPLETED | 12/07/25 04:02:00 AM | 12/08/25 04:00:00 PM | 12/07/25 04:02:00 AM | 12/08/25 03:57:00 PM |
| 1-00551917 | 4 | LEST | Disconnect | 2nd & N 1002_D2 | 115 | 10/07/25 10:52:21 AM | Planned | PREAPPROVED | 01/05/26 08:00:00 AM | 01/16/26 04:00:00 PM | | |
| 1-00561389 | 2 | LEST | Disconnect | 2nd & N 1002_D2 | 115 | 12/07/25 04:00:07 AM | Opportunity | CANCELLED | 12/07/25 04:00:00 AM | 12/08/25 04:00:00 PM | | |
| 1-00561390 | 2 | LEST | Disconnect | 2nd & N 1002_D2 | 115 | 12/07/25 04:02:50 AM | Forced | COMPLETED | 12/07/25 04:02:00 AM | 12/08/25 04:00:00 PM | 12/07/25 04:02:00 AM | 12/08/25 03:57:00 PM |
| 1-00551917 | 4 | LEST | CircuitBreaker | 2nd & N 1061L | 115 | 10/07/25 10:52:21 AM | Planned | PREAPPROVED | 01/05/26 08:00:00 AM | 01/16/26 04:00:00 PM | | |
| 1-00556805 | 5 | LEST | CircuitBreaker | 30th & A 5220 | 115 | 11/06/25 07:08:58 PM | Planned | COMPLETED | 12/01/25 08:00:00 AM | 12/04/25 04:00:00 PM | 12/01/25 12:32:00 PM | 12/03/25 10:08:00 AM |
| 1-00551806 | 6 | LEST | CircuitBreaker | 33rd & Superior 3340_L | 115 | 10/06/25 01:42:00 PM | Planned | COMPLETED | 12/03/25 08:00:00 AM | 12/04/25 04:00:00 PM | 12/03/25 09:28:00 AM | 12/04/25 01:22:00 PM |
| 1-00535376 | 3 | AEPT | Line | 36th Street & Lewis - Tulsa Power Station 138 kV | 138 | 06/17/25 09:56:12 AM | Planned | PREAPPROVED | 01/05/26 08:00:00 AM | 01/29/26 05:00:00 PM | | |
| 1-00537164 | 9 | AEPT | Disconnect | 36th Street & Lewis 1398M | 138 | 06/30/25 01:46:52 PM | Planned | IMPLEMENTED | 10/28/25 08:00:00 AM | 12/30/25 05:00:00 PM | 10/28/25 09:46:00 AM | |
| 1-00559726 | 3 | AEPT | Disconnect | 36th Street & Lewis 1398M | 138 | 11/24/25 10:14:31 AM | Planned | PREAPPROVED | 02/16/26 08:00:00 AM | 02/16/26 06:00:00 PM | | |
| 1-00559726 | 3 | AEPT | Disconnect | 36th Street & Lewis 1398M | 138 | 11/24/25 10:14:31 AM | Planned | PREAPPROVED | 03/16/26 08:00:00 AM | 03/20/26 06:00:00 PM | | |
| 1-00535376 | 3 | AEPT | CircuitBreaker | 36th Street & Lewis CB 1301A | 138 | 06/17/25 09:56:12 AM | Planned | PREAPPROVED | 01/05/26 08:00:00 AM | 01/29/26 05:00:00 PM | | |
| 1-00537164 | 9 | AEPT | CircuitBreaker | 36th Street & Lewis CB 1301A | 138 | 06/30/25 01:46:52 PM | Planned | IMPLEMENTED | 10/28/25 08:00:00 AM | 12/30/25 05:00:00 PM | 10/28/25 09:46:00 AM | |
| 1-00565317 | 4 | AEPT | Line | 36th Street & Olympia - Tulsa Power Station 138 kV | 138 | 12/18/25 03:35:57 AM | Operational | COMPLETED | 12/18/25 03:40:00 AM | 12/19/25 04:00:00 PM | 12/18/25 03:45:00 AM | 12/19/25 01:14:00 PM |